2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile
Keywords: mining industry, hybrid, csp, PV, LCOE, Solar resource
Más información
Título según WOS: | 2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile |
Título según SCOPUS: | 2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile |
Título de la Revista: | ENERGY |
Volumen: | 94 |
Editorial: | Elsevier |
Fecha de publicación: | 2016 |
Página de inicio: | 422 |
Página final: | 430 |
Idioma: | English |
DOI: |
10.1016/j.energy.2015.11.015 |
Notas: | ISI, SCOPUS |