Heurística constructiva visionaria para el problema de máquinas paralelas no relacionadas con tiempos de setup dependientes de la secuencia
Keywords: scheduling, constructive heuristics, Makespan, unrelated parallel machines
Abstract
This paper presents a look-ahead constructive heuristic for solving the unrelated parallel machine problem with sequence dependent setup times, where the objective is to minimize the completion time of the last job, or makespan. This is an NP-hard problem. Although a variety of practical situations can be modeled using this problem, still a modest number of articles devoted to it can be found in literature. The constructive heuristic proposed in this paper has a look-ahead mechanism based on a saving criterion, which permits to improve the quality of solutions against another constructive heuristic rule already reported in literature. Este artículo presenta una heurística constructiva visionaria para resolver el problema de máquinas paralelas no relacionadas con tiempos de setup dependientes de la secuencia, donde el objetivo es minimizar el tiempo de completación del último trabajo, o makespan. Este es un problema NP-hard. A pesar de que una gran variedad de situaciones prácticas pueden ser modeladas usando este problema, existe una pequeña cantidad de artículos desarrollados que se puede encontrar en la literatura. La heurística constructiva propuesta en este artículo posee un mecanismo visionario basado en un criterio de ahorro, que permite mejorar la calidad de las soluciones que se obtienen al comparar este enfoque con otras reglas heurísticas encontradas en la literatura.
Más información
Título de la Revista: | Revista de Ingeniería Industrial |
Volumen: | 5 |
Número: | 1 |
Editorial: | Universidad del Bío-bío |
Fecha de publicación: | 2006 |
Página de inicio: | 43 |
Página final: | 59 |
Idioma: | Spanish |
Notas: | http://revistas.ubiobio.cl/index.php/RI/issue/view/15/showToc |