A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules
Keywords: network analysis, buffers, Analytical techniques, Construction scheduling
Más información
| Título según WOS: | A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules |
| Título según SCOPUS: | A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules |
| Título de la Revista: | AUTOMATION IN CONSTRUCTION |
| Volumen: | 92 |
| Editorial: | Elsevier |
| Fecha de publicación: | 2018 |
| Página de inicio: | 46 |
| Página final: | 58 |
| Idioma: | English |
| DOI: |
10.1016/j.autcon.2018.03.025 |
| Notas: | ISI, SCOPUS |