Adaptive open-pit mining planning under geological uncertainty
Abstract
This research project developed an adaptive stochastic optimisation approach for multi-period production scheduling in open-pit mines under geological uncertainty, and compared it to an existing two-stage optimisation method. This new rolling-horizon optimisation approach updates the geological model each time period as new information becomes available. Numerical tests carried out earlier on open-pits of different sizes showed that, on average, the rolling-horizon adaptive policy gave better results than the non-adaptive two-stage approach. The metric used was the percentage gap between the results for each policy and those that would be obtained if the true block grades were perfectly known.
Más información
| Título según WOS: | Adaptive open-pit mining planning under geological uncertainty |
| Título de la Revista: | Resources Policy |
| Volumen: | 72 |
| Editorial: | ELSEVIER SCI LTD |
| Fecha de publicación: | 2021 |
| DOI: |
10.1016/J.RESOURPOL.2021.102086 |
| Notas: | ISI |