A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
Abstract
The purpose of this research is to develop a new procedure for generating a proactive baseline schedule for the resource-constrained project scheduling problem. The main advantage of this new procedure is that it is completely independent of the reactive policy applied. This contrasts with the traditional methods that assume a predefined reactive policy. First, we define a new robustness measure, then we introduce a branch-and-cut method for solving a sample average approximation of our original problem. In a computational experiment, we show that our procedure outperforms two other published methods, assuming different robustness measures.
Más información
Título según WOS: | ID WOS:000379627200005 Not found in local WOS DB |
Título de la Revista: | JOURNAL OF SCHEDULING |
Volumen: | 19 |
Número: | 4 |
Editorial: | Springer |
Fecha de publicación: | 2016 |
Página de inicio: | 409 |
Página final: | 428 |
DOI: |
10.1007/s10951-015-0423-3 |
Notas: | ISI |