Cutoff grade calculation incorporating the risks of acid mine drainage of waste dumps at open pit mining operation
Más información
Fecha de publicación: | 2022 |
Objetivos: | Maine objective Integrate the risk of acid mine drainage into the revised lane algorithm to calculate the cutoff grade which is going to cover the costs of controlling and/or rehabilitation of AMD of the waste dump. |
Año de Inicio/Término: | 2022-2023 |
Financiamiento/Sponsor: | AMTC,SEMILLA |
Rol del Usuario: | DIRECTOR(A) |
Notas: | This project is a collaboration with researchers at the University of Chile and is currently ongoing. The project aims to determine the risk of acid mine drainage (AMD) for each waste block at a copper mine, while also considering the costs of controlling and preventing AMD. |