A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules

Poshdar, M; Gonzalez, VA; Raftery, GM; Orozco, F; Romeo, JS; Forcael, E

Más información

Título de la Revista: Journal of Construction Engineering and Management
Volumen: 142
Asunto: 10
Editorial: American Society of Civil Engineers (ASCE)
Fecha de publicación: 2016
DOI/URL:

10.1061/(ASCE)CO.1943-7862.0001158