Competitive generation arrangements in Chile

Rudnick, Hugh

Keywords: generation, competition, management, industry, power, improvement, economics, hydroelectric, industrial, marketing, continuous, Electric, problem, solving

Abstract

The recent operation of the Chilean pool and the increasing problems in its governance has clearly demonstrated that the pool does not fulfill the conditions indicating its contribution to the development of competitive generation market. The Chilean pool indicates that changes must be implemented for the competitive market to continue developing. The main Chilean market, concepts utilized in the design of the pool, relevance of the hydroelectric dimension in the Chilean system, problems faced in the pool, and the solutions being implemented, are described.

Más información

Título de la Revista: IEEE Power Engineering Review
Volumen: 19
Número: 9
Editorial: Institute of Electrical and Electronics Engineers Inc.
Fecha de publicación: 1999
Página de inicio: 14
Página final: 17
URL: http://www.scopus.com/inward/record.url?eid=2-s2.0-0033316503&partnerID=q2rCbXpz