2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile

Parrado C.; Girard, A; Simon F.; Fuentealba, E

Keywords: mining industry, hybrid, csp, PV, LCOE, Solar resource

Más información

Título según WOS: 2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile
Título según SCOPUS: 2050 LCOE (Levelized Cost of Energy) projection for a hybrid PV (photovoltaic)-CSP (concentrated solar power) plant in the Atacama Desert, Chile
Título de la Revista: ENERGY
Volumen: 94
Editorial: Elsevier
Fecha de publicación: 2016
Página de inicio: 422
Página final: 430
Idioma: English
DOI:

10.1016/j.energy.2015.11.015

Notas: ISI, SCOPUS