A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules
Keywords: network analysis, buffers, Analytical techniques, Construction scheduling
Más información
Título según WOS: | A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules |
Título según SCOPUS: | A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules |
Título de la Revista: | AUTOMATION IN CONSTRUCTION |
Volumen: | 92 |
Editorial: | Elsevier |
Fecha de publicación: | 2018 |
Página de inicio: | 46 |
Página final: | 58 |
Idioma: | English |
DOI: |
10.1016/j.autcon.2018.03.025 |
Notas: | ISI, SCOPUS |