Optimization of Surface Utilization Using Heuristic Approaches
Abstract
A scheduling problem arising in factories producing large building blocks is modelled applying optimization techniques. The application is a shipyard workshop producing prefabricated keel elements. The objective is to maximize the number of building blocks produced in the factory during a certain time window. The solution combines a Guided Local Search heuristic with Fast Local Search techniques. A final discussion explains the additional real-life issues arising in the industrial application and how firm-specific constraints can be conveniently considered by the model.
Más información
| Título de la Revista: | SHIP TECHNOLOGY RESEARCH |
| Volumen: | 52 |
| Número: | 3 |
| Fecha de publicación: | 2015 |
| Página de inicio: | 141 |
| Página final: | 147 |
| Idioma: | English |
| URL: | https://doi.org/10.1179/str.2005.52.3.007 |
| DOI: |
10.1179/str.2005.52.3.007 |