Integrated Design of Building Projects: From BIM to Additive Manufacturing

Forcael, Eric; Garcia Alvarado, Rodrigo; Soto-Muñoz, Jaime; Pulido Arcas, Jesús; Bienvenido-Huertas, David; Moyano-Campos, Juan

Keywords: robotic arm, BIM-robot, Concrete elements, Total machine–machine integration

Abstract

This chapter explores key aspects of integrated project design using the extreme collaboration methodology, which enables the construction of BIM models that integrate architecture, structures, and MEP, using a “war room” or “information room”(i-room) where various project specialists interact in real time. To achieve the highest degree of integration within a project, the BIM model is then sent to a robotic arm that through additive manufacturing techniques, prints concrete elements previously designed in the i-room—in short, total machine–machine integration (BIM-robot).

Más información

Editorial: SPRINGER SINGAPORE PTE LTD
Fecha de publicación: 2022
Página de inicio: 421
Página final: 439
Idioma: English
URL: https://link.springer.com/chapter/10.1007/978-981-19-1894-0_23