A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules
Más información
| Título de la Revista: | Journal of Construction Engineering and Management |
| Volumen: | 142 |
| Asunto: | 10 |
| Editorial: | American Society of Civil Engineers (ASCE) |
| Fecha de publicación: | 2016 |
| DOI/URL: |
10.1061/(ASCE)CO.1943-7862.0001158 |