Application of optimized models through direct block scheduling in traditional mine planning
Más información
| Título según WOS: | Application of optimized models through direct block scheduling in traditional mine planning |
| Título según SCOPUS: | Application of optimized models through direct block scheduling in traditional mine planning |
| Título de la Revista: | JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY |
| Volumen: | 118 |
| Número: | 4 |
| Editorial: | SOUTHERN AFRICAN INST MINING METALLURGY |
| Fecha de publicación: | 2018 |
| Página de inicio: | 381 |
| Página final: | 386 |
| Idioma: | English |
| DOI: |
10.17159/2411-9717/2018/v118n4a8 |
| Notas: | ISI, SCOPUS |