Man

Jorge Pereira Gude

Profesor Asociado

Universidad Adolfo Ibáñez

Viá del Mar, Chile

Líneas de Investigación


Operations Management, Production, Optimization

Educación

  •  Administración y dirección de empresas, Universitat Politècnica de Catalunya. España, 2004
  •  Ingeniería en Organización Industrial, Universitat Politècnica de Catalunya. España, 2000
  •  Ingeniería Electrónica, Universitat Politècnica de Catalunya. España, 1998

Experiencia Académica

  •   Profesor Colaborador (Assistant Professor) Full Time

    Universitat Politècnica de Catalunya

    Barcelona, España

    2003 - 2010

  •   Profesor Titular (Associate Professor) Full Time

    Universitat Politècnica de Catalunya

    Barcelona, España

    2010 - 2014

  •   Profesor planta especial Full Time

    UNIVERSIDAD CATOLICA DEL NORTE

    Ingeniería

    Antofagasta, Chile

    2014 - 2015

  •   Profesor Asociado Full Time

    universidad Adolfo Ibáñez

    Ingeniería y Ciencias

    Viña del Mar, Chile

    2015 - At present

Experiencia Profesional

  •   Personal de Soporte a la investigación Full Time

    Universitat Politècnica de Catalunya

    Barcelona, España

    2001 - 2003

Formación de Capital Humano


Dirección de una tesis doctoral (Doctoranda Mariona Vilà, título "Some contributions to JIT sequencing issues with exact, heuristic and hybrid procedures"), 4 tesis de pregrado y 6 tesis de postgrado.


Difusión y Transferencia


Participación en proyecto "Forecasting of water consumption in the Antofagasta Region" para considerar consumo de agua en la segunda Región.

Cartas del lecto en Mercurio de Valparaíso.

Miembro del comité organizador y científico del XI congreso OPTIMA de la sociedad chilena de investigación operativa.


Premios y Distinciones

  •   Premio al mejor paper en GECCO 2016, Track ECOM

    Association for Computing Machinery Special Interest Group on Genetic and Evolutionary Computation (SIGEVO)

    Estados Unidos, 2016

    Mejor trabajo presentado en GECCO conferencia principal en el área de algoritmos evolutivos.

  •   Habilitación Profesor Titular

    Gobierno de España

    España, 2009

    Habilitación para ejercer como profesor titular en las universidades públicas españolas


 

Article (53)

A note on "Algorithms for the Calzedonia workload allocation problem"
A note on the flowtime network restoration problem
The Impact of Candidates' Profile and Campaign Decisions in Electoral Results: A Data Analytics Approach
Tree optimization based heuristics and metaheuristics in network construction problems
A hybrid K-means and integer programming method for commercial territory design: a case study in meat distribution
A Multi-Criteria Pen for Drawing Fair Districts: When Democratic and Demographic Fairness Matter
Assembly line balancing with parallel workstations
Heuristic and exact algorithms for minimum-weight non-spanning arborescences
Multiobjective scheduling algorithm for flexible manufacturing systems with Petri nets
Minimizing the number of machines with limited workload capacity for scheduling jobs with interval constraints
On the complexity of assembly line balancing problems
A memetic algorithm for the cost-oriented robotic assembly line balancing problem
An exact approach for the robust assembly line balancing problem
Lateness minimization in pairwise connectivity restoration problems
Modelling and solving a cost-oriented resource-constrained multi-model assembly line balancing problem
The robust (minmax regret) assembly line worker assignment and balancing problem
Designing and constructing networks under uncertainty in the construction stage: Definition and exact algorithmic approach
The single machine weighted mean squared deviation problem
The single machine weighted mean squared deviation problem
A new model for supply chain network design with integrated assembly line balancing decisions
Procedures for the bin packing problem with precedence constraints
Procedures for the bin packing problem with precedence constraints
The robust (minmax regret) single machine scheduling problem with interval processing times and total weighted completion time objective
The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective
The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective
An exact algorithm for the mixed-model level scheduling problem
Empirical evaluation of lower bounding methods for the simple assembly line balancing problem
Network construction problems with due dates
Network construction problems with due dates
Variable neighborhood search heuristics for a test assembly design problem
Variable Neighbourhood Search heuristics for a test assembly design problem
A branch-and-bound algorithm for assembly line worker assignment and balancing problems
An enumeration procedure for the assembly line balancing problem based on branching by non-decreasing idle time
Exact and heuristic procedures for single machine scheduling with quadratic earliness and tardiness penalties
Exact and heuristic procedures for single machine scheduling with quadratic earliness and tardiness penalties
The robust set covering problem with interval data
The robust set covering problem with interval data
The flowtime network construction problem
The flowtime network construction problem
Exact and heuristic algorithms for the interval data robust assignment problem
Exact and heuristic algorithms for the interval data robust assignment problem
Procedures for the Time and Space constrained Assembly Line Balancing Problem
Procedures for the Time and Space constrained Assembly Line Balancing Problem
A Dynamic Programming Based Heuristic for the Assembly Line Balancing Problem
A Beam Search approach for the optimization version of the Car Sequencing Problem
A Beam Search approach for the optimization version of the Car Sequencing Problem
A GRASP approach for the extended car sequencing problem
Solving an urban waste collection problem using ants heuristics
Solving an urban waste collection problem using ants heuristics
A GRASP algorithm to solve the unicost set covering problem
Ant algorithms for a time and space constrained assembly line balancing problem
Modeling the problem of locating collection areas for urban waste management. An application to the metropolitan area of Barcelona
Modeling the problem of locating collection areas for urban waste management. An application to the metropolitan area of Barcelona

ConferencePaper (11)

A Hybrid Genetic Algorithm for the One-Dimensional Minimax Bin-Packing Problem with Assignment Constraints
Extension of the CMSA Algorithm: An LP-based Way for Reducing Sub-instances
An Extended Beam-ACO Approach to the Time and Space Constrained Simple Assembly Line Balancing Problem
Incorporating preferences to a multi-objective ant colony algorithm for time and space assembly line balancing
Beam-ACO applied to assembly line balancing, Ant Colony Optimization and Swarm Intelligence
Comparison between metaheuristic and exact models in the packing problem resolution
A comparative study of simulated annealing and genetic algorithm
Ant Algorithms for Urban Waste Collection Routing
Ant algorithms for assembly line balancing
Ant colonies for the RCPS problem
Models and procedures for electric energy distribution planning. A review

Proyecto (11)

Assembly line balancing for industry 4.0.
Optimization Tools for Districting Decisions Under Uncertainty
Forecasting of water consumption in the Antofagasta Region
Heterogeneous assembly line balancing problems with process selection features
ICARUS: Integración de la Cadena de Actividades de Recogida Urbana Selectiva
Modelo de gestión para la innovación de la secuencia de suministros
PROTHIUS : Programación Restringida de Operaciones en Talleres Híbridos Integrados sobre Unidades en Secuencia
PROTHIUS III: Programación Restringida de Operaciones en Talleres Híbridos Integrados sobre Unidades en Secuencia. Industria del automóvil (aspectos económicos, jurídicos y sociales)
PROTHIUS-II : Programación Restringida de Operaciones en Talleres Híbridos Integrados sobre Unidades en Secuencia (Industria del automóvil)
Secuenciación de unidades con restricciones múltiples
Secuenciación de unidades no homogéneas
60
Jorge Pereira

Profesor Asociado

Universidad Adolfo Ibáñez

Viá del Mar, Chile

1
WILFREDO YUSHIMITO

ASSOCIATE PROFESSOR

ENGINEERING & SCIENCES

UNIVERSIDAD ADOLFO IBAÑEZ

Viña del Mar, Chile

1
Óscar Vásquez

PROFESOR TITULAR

INGENIERÍA INDUSTRIAL

UNIVERSIDAD DE SANTIAGO

SANTIAGO, Chile

1
Sebastian Moreno

Profesor asociado

Ingeniería y ciencias

Universidad Adolfo Ibanez

Vina del Mar, Chile

1
luis osorio

ingeniero especialista en automatización

ingenieria

Tidek Ltda

santiago, Chile

1
Franco Quezada

Academico Asistente

Departamento de Ingeniería Industrial

Universidad de Santiago de Chile

Santiago, Chile