Pierre.jpg_thumb90

Pierre Nancel-Penard

Investigador

Universidad de Chile

Santiago, Chile

Líneas de Investigación


Mine Planning and Design for Complex Open-Pit Operations. Management Planning and Control of Underground Mine Construction.

Educación

  •  matemáticas aplicadas, UNIVERSITE DE BORDEAUX I. Francia, 1997

Experiencia Académica

  •   Investigador Full Time

    UNIVERSIDAD DE CHILE

    Santiago, Chile

    2013 - At present

Experiencia Profesional

  •   Investigador asociado Full Time

    Universidad de Chile

    Chile

    2009 - At present

  •   Profesor Ciencias físicas, Matématicas. Part Time

    CFA Monbazillac

    Francia

    2006 - 2007

  •   Profesor Matématicas, Ciencias de la computación Part Time

    CFA Périgueux

    Francia

    2006 - 2007

  •   Ingeniero desarollo Other

    Espace Bénévolat

    Francia

    2004 - 2004

  •   Ingeniero desarollo Full Time

    ALCYON

    Francia

    1999 - 2001

  •   Ingeniero de estudios Full Time

    Thales IS

    Francia

    2001 - 2002

  •   Ingeniero de estudios Full Time

    Thales IS

    Francia

    1998 - 1999

  •   Profesor de francés Full Time

    Allianza Francesa

    Francia

    2008 - 2008


 

Article (7)

A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine block sequencing problem
Development and analysis of a methodology to generate operational open-pit mine ramp designs automatically
Optimizing pushback design considering minimum mining width for open pit strategic planning
A heuristic approach for scheduling activities with 'OR'-precedence constraints at an underground mine
A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application
VALUE-OPTIMAL DESIGN OF RAMPS IN OPEN PIT MINING
Aggregation heuristic for the open-pit block scheduling problem

BookSection (2)

Methodology to optimize and sequence the semiautomated ramp design in underground mining
Open-pit mine production scheduling: improvements to MineLib library problems

ConferencePaper (9)

A comparison between open-pit ramp design obtained by varying design characteristics and through linear optimization
Application of a semi-automatic method for optimal ramp design
A procedure to generate optimized ramp designs using mathematical programming
An Integer Linear Programming Model For Optimizing Open Pit Ramp Design
Semi-Automatic Generation of Ramps in Open Pit Mining Using Mathematical Programming
A comparison of conventional and direct block scheduling methods for open pit mine production scheduling
Factores relevantes para la comparación de modelos de optimización en minas a rajo abierto
MineLink: A framework for optimization in open pit block scheduling
MIP based heuristics to optimize block scheduling: Improving known solutions in Minelib
20
Pierre Nancel-Penard

Investigador

Universidad de Chile

Santiago, Chile

7
NELSON MORALES

Investigador Asociado

Universidad de Chile

Santiago, Chile

2
Enrique Jélvez

Researcher

Faculty of Physical and Mathematical Sciences

Universidad de Chile

Santiago, Chile

1
Juan Peypouquet

Associate Professor

UNIVERSIDAD DE CHILE

Santiago, Chile