Man

NELSON VICTOR MORALES VARELA

Investigador Asociado

Universidad de Chile

Santiago, Chile

Líneas de Investigación


Investigación de Operaciones, Planificación Minera, Optimización y Simulación.

Educación

  •  Ciencias, UNIVERSITE DE NICE-SOPHIA ANTIPOLIS. Chile, 2007
  •  Ingeniero Civil Matemático, UNIVERSIDAD DE CHILE. Chile, 2002

Experiencia Académica

  •   Profesor Part Time

    UNIVERSIDAD ANDRES BELLO

    Ingeniería

    Santiago, Chile

    2007 - 2008

  •   Profesor Part Time

    UNIVERSIDAD DE CHILE

    Ciencias Físicas y Matemáticas

    Chile

    2009 - At present

  •   Profesor Part Time

    UNIVERSIDAD DE SANTIAGO DE CHILE

    Matemáticas

    Santiago, Chile

    2010 - 2010

Experiencia Profesional

  •   Investigador Full Time

    Instituto de Innovación en Minería y Metalurgia

    Santiago, Chile

    2007 - 2009

  •   Investigador Full Time

    Universidad de Chile

    Santiago, Chile

    2009 - At present

  •   Consultor Printipal Full Time

    Mathematical Solutions For Business

    Santiago, Chile

    2008 - At present

Formación de Capital Humano


Mi experiencia en formación de capital humano se concentra en alumnos de pregrado de Ingeniería de Minas de la Universidad de Chile, mientras que en postgrado en el programa de Magíster y Doctorado de Ingeniería de Minas, aunque también he dirigido y codirigido varias memorias y tesis en otras universidades (Universidad de Santiago y Universidad Técnica Federico Santa María) en áreas de informática y de matemáticas.

He dirigido las siguientes memorias de pregrado en los últimos 3 años:

Héctor Toro, Programación multi-criterio de excavaciones horizontales en el corto plazo,
Gonzalo Nelis S.,Planificación Adaptativa Utilizando Simulación Geoestadística Antitética. Ingeniero de Minas. 27/05/2016
Julio Magri R., Planificación y Diseño Minero dado por Camiones Autónomos. Ingeniero de Minas. 09/01/2015
Cecilia Julio Fernández., Cálculo de Envolvente Óptima para la Transición de Explotación desde Minería Cielo Abierto a Subterránea, Bajo Incertidumbre Geológica. Ingeniero de Minas. 13/11/2015
Macarena Tapia Paredes., Metodología de Control del Riesgo en Planes de Minería a Cielo Abierto Sujetos a Incertidumbre. Ingeniero de Minas. 22/06/2015
Fabián Manríquez L., Evaluación de la Incertidumbre Geológica y Operacional en Planes Mineros a Corto Plazo en Faenas a Cielo Abierto. Ingeniero de Minas. 27/08/2015
Alejandra Gómez J., Secuenciamiento Multicriterio para Minería Subterránea Selectiva. Ingeniero de Minas. 10/04/2015
Maximiliano Alarcón U., Valorización del Aumento de Confiabilidad en Planes de Producción de Sistemas Mineros Subterráneos. Ingeniero de Minas. 16/01/2014
Patricio Allende C., Plan Productivo Considerando Interacción Rajo-Subterránea, Mina El Soldado. Ingeniero de Minas. 16/01/2014
Emilio Vargas V., Cálculo de Envolvente Económica para Minas de Block/Panel Caving bajo incertidumbre geológica. Ingeniero de Minas. 19/12/2014
Edgardo Madariaga G., Modelo de Planificación de Corto Plazo a Través de Optimización de Múltiples Procesos. Ingeniero de Minas. 17/01/2014

He dirigido las siguientes tesis de magister en los últimos 3 años:
Gonzalo Nelis S., Planificación Adaptativa Utilizando Simulación Geoestadística Antitética. Magister en Minería. 27/05/2016
Walter Loli M, Metodología de Planificación a Cielo Abierto Considerando Incorporación de In Pit Crusher and Conveyors. Magister en Minería. 22/04/2016
Fabián Manríquez L., Evaluación de la Incertidumbre Geológica y Operacional en Planes Mineros a Corto Plazo en Faenas a Cielo Abierto. Magister en Minería. 27/08/2015
Alejandra Gómez J., Secuenciamiento Multicriterio para Minería Subterránea Selectiva. Magister en Minería. 10/04/2015
Edgardo Madariaga G., Modelo de Planificación de Corto Plazo a Través de Optimización de Múltiples Procesos. Magister en Minería. 17/01/2014
Emilio Vargas V., Cálculo de Envolvente Económica para Minas de Caving bajo Incertidumbre Geológica. Magister en Minería. 19/12/2014

Dirigí la tesis doctoral de Enrique Jelvez: "" (2016) y actrualmente estoy dirgiendo 2 tesistas de doctorado: Gonzalo Nelis y Fabián Manríquez.

Dirigí el trabajo postdoctoral de Pierre Nancel-Penard durante los años 2013 y 2014.

Actualmente estoy guiando además 12 memorias de título, 7 magíster en ingeniería de minas, 2 tesistas de doctorado y dos postdoctorados.


Difusión y Transferencia


He liderado el desarrollo de varios proyectos de investigación aplicada, los cuales se han traducido en herramientas de software para la planificación minera, las cuales han sido licenciadas tanto para uso industrial como académico. A continuación un listado de estas licencias.

• 1 Licencia DSIM OpenPit, Escondida Ltda, 2016.
• 1 Licencia DSIM, IM2, 2016.
• 1 Licencia (temporales, para prueba) UDESS, Snowden, 2016.
• 1 Licencia DOPPLER + 1 Licencia MINELINK, Matías Palma, Coeur Mining, 2016.
• 1 Licencias DOPPLER, Cristian Opazo, División Chuquicamata, 2016.
• 1 Licencia DOPPLER, Claudio Varas, Minería 21, 2015.
• 3 Licencias DOPPLER + MINELINK, Universidad Católica del Norte, 2015.
• 10 Licencias DOPPLER, Universidad Federal de Mina Gerhais, 2015.
• 10 Licencias MINELINK, Universidad Federal de Mina Gerhais, 2015.
• Licencia DSIM OpenPit, División Gabriela Mistral, 2014.

Los últimos dos años mi grupo ha organizado talleres de planificación minera con la industria, con asistencia de 50 y 80 personas respectivamente. Períodicamente hago presentaciones en las universidades Federico Santa María y más recientemente en la Universidad Nacional Andrés Bello.



 

Article (24)

Column Generation for Mining Cut Definition with Geometallurgical Interactions
Optimal Pitwall Shapes to Increase Financial Return and Decrease Carbon Footprint of Open Pit Mines
Short-term open-pit production scheduling optimizing multiple objectives accounting for shovel allocation in stockpiles
Stochastic Final Pit Limits: An Efficient Frontier Analysis under Geological Uncertainty in the Open-Pit Mining Industry
A mathematical model for the scheduling and definition of mining cuts in short-term mine planning
Optimizing pushback design considering minimum mining width for open pit strategic planning
A heuristic approach for scheduling activities with 'OR'-precedence constraints at an underground mine
A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application
Discrete event simulation to design open-pit mine production policy in the event of snowfall
Incorporation of Geometallurgical Attributes and Geological Uncertainty into Long-Term Open-Pit Mine Planning
VALUE-OPTIMAL DESIGN OF RAMPS IN OPEN PIT MINING
A new model for automated pushback selection
Antithetic random fields applied to mine planning under uncertainty
Application of optimized models through direct block scheduling in traditional mine planning
Application of optimized models through direct block scheduling in traditional mine planning
Open pit mine planning considering geomechanical fundamentals
Open pit mine planning considering geomechanical fundamentals
Aggregation heuristic for the open-pit block scheduling problem
Increasing the value and feasibility of open pit plans by integrating the mining system into the planning process
Increasing value and feasibility of open pit plans by integrating the mining system into the planning process
Optimizing open pit block scheduling with exposed ore reserve
Optimizing open-pit block scheduling with exposed ore reserve
GATHERING RADIO MESSAGES IN THE PATH
On the complexity of bandwidth allocation in radio networks

ConferencePaper (31)

A procedure to generate optimized ramp designs using mathematical programming
Performance assessment of antithetic random fields in a stochastic mine planning model
Short-term open-pit mine production scheduling with hierarchical objectives
Production Estimate in Selective Underground Mining by Simulations
A New Methodology for the Automated Pushback Selection
Qualitative Review of Alternative Transport Systems for Open Pit Mine
Virtual Planning Room: Analytical Mine Planning Work, Based on Tools Integration and a Robust Cloud Information System
A comparison of conventional and direct block scheduling methods for open pit mine production scheduling
A hybrid improvement heuristic for the constrained pit problem in open pit mining
Agendamiento multi-criterio de actividades de preparación minera en el corto plazo
Comparación de distintas aproximaciones para calcular pit final robusto bajo incertidumbre de leyes
Cálculo de envolvente económica bajo incertidumbre geológica en minas de Block Caving
Evaluación de incertidumbre geológica y operacional en planes mineros de corto plazo a cielo abierto
Factores relevantes para la comparación de modelos de optimización en minas a rajo abierto
Integración de parámetros técnico-económicos y variables geometalúrgicas en la planificación minera
Integración del peligro sísmico en planificación minera de Panel Caving
MineLink: A framework for optimization in open pit block scheduling
MIP based heuristics to optimize block scheduling: Improving known solutions in Minelib
Modelo de agendamiento de actividades de preparación minera de corto plazo
Multi-criteria optimization for scheduling of a Bench & Fill mine
Multi-criteria optimization for scheduling of a bench and fill mine
Nuevos desafíos para el modelamiento en planificación minera
Optimal economic envelop of joint open pit and underground mines
Optimal economic envelope of joint open-pit and underground mines
Planificación minera a cielo abierto utilizando fundamentos geomecánicos
UDESS - A multipurpose scheduling problem for mine planning
Using simulation to assess the trade-off between value and reliability in open pit planning
VGML: integración de minería de datos, geostadística y planificación minera en la nube
Footprint and Economic Envelope Calculation. for Block Caving Based Mines Under Geological Uncertainty
Integrating data analysis, geostatistics and mine planning to compute the ultimate pit
Stochastic Programming applied to Mine Planning under Geological Uncertainty with Different Levels of Information

Proyecto (6)

Diseño de un Sistema de Planificación para la Preparación Minera (IM2-058-2014)
Diseño de un Sistema de Planificación para la Preparación Minera Segunda Parte
VIRTUAL PLANNING ROOM - AMBIENTE INTEGRADO DE PLANFICACIÓN MINERA
VIRTUAL PLANNING ROOM - AMBIENTE INTEGRADO DE PLANIFICACIÓN MINERA
Planificación integral para minas de block caving con tecnología de extracción semiautónoma.
ADVANCED MINING TECHNOLOGY CENTER
53
NELSON MORALES

Investigador Asociado

Universidad de Chile

Santiago, Chile

9
Pierre Nancel-Penard

Investigador

Universidad de Chile

Santiago, Chile

5
Enrique Jélvez

Researcher

Faculty of Physical and Mathematical Sciences

Universidad de Chile

Santiago, Chile

4
Gonzalo Nelis

Profesor Asistente

Ingeniería Metalúrgica y de Materiales

Universidad Técnica Federico Santa María

Santiago, Chile

2
JAVIER VALLEJOS

academic

mining enigneering

university of chile

las condes, Chile

2
Fabián Manríquez

Instructor académico

Departamento de Ingeniería Metalúrgica y de Materiales

Universidad Técnica Federico Santa María

Santiago, Chile

1
Phu Minh Vuong Nguyen

Investigador

Advanced Mining Technology Center

Santiago, Chile

1
Maximiliano Alarcon

Researcher

CSIRO Chile ICE.

Santiago, Chile

1
JULIAN ORTIZ

Associate Professor

Robert M. Buchan Department of Mining

Queen's University

Kingston, ON, Canada

1
Alejandro Cáceres

Gerente de Innovación y Desarrollo

Innovación

GeoInnova

Providencia, Chile

1
Xavier Emery

Full professor

Mining Engineering

UNIVERSIDAD DE CHILE

Santiago, Chile

1
Juan Peypouquet

Associate Professor

UNIVERSIDAD DE CHILE

Santiago, Chile