Marcos Goycoolea Guzmán
Professor
UNIVERSIDAD ADOLFO IBAÑEZ
Santiago, Chile
OPERATIONS RESEARCH; MATHEMATICAL PROGRAMMING; INTEGER PROGRAMMING; NATURAL RESOURCE MANAGEMENT; MINING
-
Industrial Engineering, GEORGIA INSTITUTE OF TECHNOLOGY. Estados Unidos, 2006
-
Mathematical Engineer, UNIVERSIDAD DE CHILE. Chile, 2001
-
Professor Full Time
UNIVERSIDAD ADOLFO IBANEZ
Santiago, Chile
2006 - A la fecha
-
Research Director Full Time
UNIVERSIDAD ADOLFO IBANEZ
Santiago, Chile
2015 - 2018
-
Head of Operations and Business Analytics Group Other
UNIVERSIDAD ADOLFO IBANEZ
Santiago, Chile
2020 - A la fecha
-
Head of Operations Group Other
UNIVERSIDAD ADOLFO IBANEZ
Santiago, Chile
2008 - 2015
-
Independent Consultant Other
Marcos Goycoolea
Santiago, Chile
2010 - 2019
-
Founding Partner and Lead Part Time
Alicanto Labs
Santiago, Chile
2019 - A la fecha
-
Associate Editor Other
Mathematical Programming Computations
Santiago, Chile
2015 - 2018
-
FONDECYT grant panel member (Engineering 2) Other
CONICYT (previous name of ANID)
Santiago, Chile
2011 - 2015
Supervised Theses
2021 (Jun). [Expected] Abalos, Pablo. Masters in Engineering Sciences. Universidad Adolfo Ibáñez.
2021 (Jun) [Expected]. Lamas, Patricio. PhD in Industrial Engineering and Operations Research. Universidad Adolfo Ibañez.
2021 (Feb). Rivera, Orlando. PhD in Industrial Engineering and Operations Research. Joint degree between Universidad Adolfo Ibañez, Chile and University of Bordeaux, France.
2015 (Mar). Rivera, Orlando. Masters in Engineering Sciences. Universidad Adolfo Ibáñez.
2012 (Jul). Muñoz, Gonzalo. Mathematical Engineering. Universidad de Chile.
2009 (Nov). Gajardo, Alvaro. Industrial Engineering. Universidad Adolfo Ibáñez.
2009 (Sep). Chicoisne, Renaud. Master 2 Recherche, Recherche Operationnelle et Poroductique. POLYTECH Clermont-Ferrand
Marcos works with the mining industry by transfering optimization technologies to help meet strategic planning needs. He was worked with consultancies and mining companies on projects belonging to companies including Barrick Gold, Codelco, Goldcorp, Nevada Gold Mines, Newmont Gold, Teck, Vale and others. The optimization methods he has developed as part of his research have made their way into numerous commercial software packages for mine planning. Recently, together with colleagues, he founded a technology start-up called Alicanto Labs, that develops a full-fledged mine planning optimizer that is globally distributed through Deswik, a world-leading provider of software technologies for mine planning.
-
Plenary Speaker
INFORMS Optimization Society Meeeting
Estados Unidos, 2018
Large-scale Open Pit Mine Production-Scheduling
-
First place in CORFO technology transfer competition 2017
CORFO
Chile, 2017
First place in CORFO technology transfer competition for project OPEN MINE PLANNER (with Eduardo Moreno and Orlando Rivera).
-
Henry Krumb Lecturer 2018
Society of Mining Engineers (SME)
Estados Unidos, 2018
Distinction awarded to eight speakers per year at the Society of Mining Engineers (SME) annual meeting. Each award winner prepares a long-form lecture of their SME presentation. This lecture is advertised throughout the mining engineering community, and the speakers are invited to give it in different schools and institutions.
-
Forestry Best Paper Award 2013
INFORMS
Estados Unidos, 2013
Awarded by the Energy and Natural Resources Section of the INFORMS Society for the paper “Imposing Connectivity Constraints in Forest Planning Models.”
-
Forestry Best Paper Award 2005
INFORMS
Estados Unidos, 2005
Awarded by the Energy and Natural Resources Section of the INFORMS Society for the paper “Harvest scheduling subject to maximum area restrictions : exploring exact approaches.”
-
Henry Krumb Lecturer 2020
Society of Mining Engineers
Estados Unidos, 2020
Distinction awarded to eight speakers per year at the Society of Mining Engineers (SME) annual meeting. Each award winner prepares a long-form lecture of their SME presentation. This lecture is advertised throughout the mining engineering community, and the speakers are invited to give it in different schools and institutions.
Alicanto Scheduler: Optimization in project management for underground mine planning. |
Packaging and validation of Alicanto Scheduler, an optimization technology for mine planning |
Tecnologias de optimizacion en gestion de proyectos para la resolucion de problemas de planificacion minera estrategica. |
Large scale optimization and uncertainty=> Challenges in strategic mine planning. An interdisciplinary approach. |
Production scheduling=> a mathematical programming approach and applications to natural resource management. |
Proximal cutting planes for mixed integer programming and applications to the traveling salesman problem and mixed integer second order cone programming |
Mathematical Modeling for Industrial and Management Science Applications=> An Interdisciplinary Approach |
Methodologies for Mixed Integer Linear Programming Models |
Sistemas complejos, computación evolutiva y aplicaciones a la planificación minera |